Facebook
Twitter
Google+
LinkedIn
Pinterest

Chengdu Shugong Machinery Manufacturing Co.,ltd

peter@floor-shotblaster.com

  • Home
  • About us
  • Products
    • Hot sale products
    • Floor stripper/scraper
    • Shot blaster part
    • concrete shot blaster
    • stainless steel shot blaster
  • News
  • Inquiry
  • Contact us

News

Home News Which aspects determine the construction...

Pavement shot blasting machines are gradually being accepted by our country, and they have been well applied in concrete pavement roughening treatment, steel plate derusting, and pavement cleaning. However, during the construction process, it is not as simple as turning on the switch of the road shot blasting machine. If you want to get a better cleaning effect, you must operate according to the specific conditions during the construction process. Then you should pay attention to the construction process. What is it?
  According to the summary of on-site construction and construction, if any advanced thing cannot be combined with the actual situation in the construction process, then it will definitely not get the best effect. Therefore, in addition to operating in accordance with the equipment operating regulations, you should also pay attention to the following aspect:

   1. The pavement shot blasting machine should be fully carried out during the shot blasting process, and it should not be missed. If the working area is too large and segmentation is required, the overlap length of each working surface should be controlled within 3-3.5cm.

   2. In order to ensure an ideal napping effect as a whole, the single working width of the road shot blasting machine should not be less than 25cm.

   3. During the construction process, the road shot blasting machine should be carried out in accordance with the direction of the flow of the vehicle, so as to obtain an ideal treatment effect.

   4. The shot blasting effect should be based on removing impurities such as floating slurry. When the bridge deck float is thick, the operator should control the power of the shot blasting machine within 300 rpm, and the machine will advance by itself. When the bridge deck float is thin or exposed, the operator should blast the machine according to the situation. The power of the pill machine is controlled above 1000-1800 rpm, so that the entire bridge deck can be leveled.

   5. After the shot blasting is finished, use a waterwheel to rinse and keep it clean. After drying, the bridge deck waterproof layer can be treated.

Product Categories

  • Hot sale products
  • Floor stripper/scraper
  • Shot blaster part
  • concrete shot blaster
  • stainless steel shot blaster

Contact Us

 peter

peter@floor-shotblaster.com

008618380257971

No.180,North Jianye Road,Jinyuan,Dayi

Links

our shop in alibabaOur shop in China

LatestPost

  • Product features of Xinjiang oil tank vertical shot blasting machine
    Product features of Xinjiang oil tank ve
    2025-06-13
  • How to remove old epoxy floor paint film with road shot blasting machine
    How to remove old epoxy floor paint film
    2025-03-27
  • The road shot blasting machine has three functions on cement concrete road
    The road shot blasting machine has three
    2025-03-22

Feedback

Contact Us

3404293200

008618380257971

peter@floor-shotblaster.com

live:3404293200

No.180,North Jianye Road,Jinyuan,Dayi

Mobile Website

Copyright © 2013-2019 Chengdu Shugong Machinery Manufacturing Co.,ltd All Rights Reserved.

Inquiry Us Now !
Inquiry Us Now !